At renovation handover, ask for one folder that answers four questions: what work was agreed to, which inspections are complete or still open, how to operate and maintain what was installed, and who will close any outstanding items. Start that folder before the final walk-through. It is easier to locate a model number or a photo of a concealed shutoff while the people who installed it are still on site.

A small bathroom update may need only a handful of records. An addition, a finished basement or a renovation involving several trades can need more. Ask for what applies to your scope rather than assuming every job comes with the same closeout documents.

1. Keep the agreed scope and the final account together

Save the contract, referenced drawings or scope, approved changes and the final invoice. Keep receipts or other payment records with them. If the contract specified one flooring product and you approved a substitution, keep the approval and the exact product that was installed. That gives you a better record than an invoice that just says “flooring.”

Compare the final invoice with the original scope and the changes you accepted. Ask what an unfamiliar item refers to instead of relying on memory. Ontario’s home renovation consumer guidance explains what to look for in written contracts, including materials and warranties. For payment questions, consult your agreement and applicable requirements rather than treating a handover checklist as a payment rule.

2. Separate permit, electrical and walk-through records

Municipal permit: If the work had a building permit, ask for the permit number, the approved drawings and applicable revisions, plus confirmation of which required inspections are complete. If the permit is still open, ask what remains, who will book it and how you can confirm the final status. The City of Niagara Falls’ inspection guide lists final inspection as a separate stage and says to ask the inspector which occupancy requirements apply. If the property is elsewhere in Niagara, check with that municipality.

Electrical: For work covered by an Electrical Safety Authority notification, ask who filed it and request a copy of the ESA Certificate of Acceptance once issued. ESA sends it to the notification filer after the work has been reviewed and passed. Do not assume the municipality’s building inspection closes the electrical file.

Homeowner walk-through: This is where you check what you can see and use, such as drawers, doors and controls, and record any outstanding work. It is not a substitute for a required inspection. A room can look finished while a permit item, warranty document or return visit remains open.

3. Record what was installed and how to look after it

Ask for product names and model numbers where they will help with service or replacement, plus any applicable manuals and warranty documents. For installed equipment, record the serial number if available. For finishes, keep enough detail to identify a match: paint brand, colour code and sheen by room; tile line, size and colour; grout colour; and flooring product and finish. Ask whether there are labelled spare pieces, and where they will be left.

Confirm who handles a warranty request, what the written warranty covers and whether anything needs registration or proof of purchase. Keep the contractor’s written terms and the manufacturer’s documents separately: a product warranty is not necessarily the same as coverage for labour or installation. Ask which cleaner or maintenance steps the product maker recommends, particularly for new surfaces you will use straight away.

4. Walk through the controls and service access

Ask someone to show you what was changed, not just hand you a stack of manuals. For example, identify the shutoff serving a new sink, the removable panel for a tub or valve, and any new equipment that needs routine care. In a finished basement, that might include the sump alarm or where to reach a backwater valve, if those were part of the work. Save labelled photos of useful locations. If relevant photos of concealed work are already available, file them with the drawings as a reference, not as a substitute for inspection records.

5. Make one short list of what is still open

Write each item as a location, action, responsible person and target date. “Kitchen, right pantry door rubs, installer to adjust, Tuesday” gives you something you can check. List missing documents and inspection follow-ups separately from finish touch-ups. Agree how completion will be confirmed and keep the latest list in the handover folder.

Do I need one binder, or will a shared folder work?

Either works if you can still open the files later. Download copies rather than relying on a link or login you might lose. Start with five sections: scope and invoices, permits and inspections, product and warranty records, service locations, and open items. Mark anything that does not apply so you can tell it apart from a missing record.

If you are planning a Niagara renovation, our whole-home renovation checklist covers the wider project. To discuss your scope, contact Homes By Adam and tell us what you are changing and what you want to be able to maintain or service after the work is done.