Before contractors price a home addition, give them a dated package that describes the same project across its drawings, specifications and written scope. It should distinguish confirmed decisions from assumptions and identify information still being developed. Otherwise, two prices may reflect two different interpretations of the work.

This is a checklist for reviewing pricing information with your project team, not a municipal submission checklist. For the broader process, see our guide to planning a home addition in Niagara. Here, the focus is what each document needs to explain before you compare construction proposals.

1. State what the package is ready for

Ask the designer to identify the purpose and status of the documents. For your pricing discussion, distinguish:

  • Concept information: The proposed arrangement and design direction, with unresolved details clearly identified.
  • Permit information: Documents prepared for the applicable approval process, with their submission and review status recorded.
  • Pricing information: The drawings, specifications, selections and written instructions contractors should use to prepare their proposals.

These descriptions can overlap. They are not three guaranteed levels of completeness, and a permit set does not tell you whether every finish or purchasing decision has been made.

The City of Niagara Falls permit process calls for the required site plans, drawings and specifications, and notes that review may require revisions or additional documents. It also distinguishes an accepted application from an issued permit. Confirm requirements with the municipality where the property is located; do not label an unapproved set “approved” because it has been submitted.

2. Create a dated document register

Start the pricing package with a simple list of its contents. Record each drawing number, title, revision and date, along with the specifications, selection schedules and reports being included. State the date the package was issued for pricing.

Check that attachments match the register. An updated floor plan paired with an older elevation leaves the contractor to resolve a design question that should come back to the team.

Keep subsequent clarifications together. If a window changes during pricing, identify the affected documents and send the same written update to every contractor preparing a proposal. Ask each proposal to list the package and updates it includes.

3. Separate measured conditions from assumptions

Existing-condition information should help a contractor understand both the house and the limits of what has been investigated.

Ask the team to identify:

  • Which dimensions were measured and which remain approximate.
  • Which walls, floors and ceilings were accessible for inspection.
  • Where foundations, framing or services remain concealed.
  • Which photographs correspond to important connection locations.
  • What investigation is still needed, who arranges it and when.

A photograph can explain a room but cannot establish everything behind its finishes. Likewise, an older drawing should not silently become proof of the present construction.

Where information is missing, name the uncertainty. “Existing floor framing at proposed opening not yet verified” gives the pricing team a clearer question than “allow for existing conditions.”

4. Read plans, elevations and sections together

Review the sheets as different views of one proposal, not as separate illustrations.

Start with the addition’s footprint and room arrangement. Then compare the exterior elevations and sections, which show vertical relationships through the building. Ask the designer to check that window and door references, roof shapes, ceiling heights and material changes agree.

Pay particular attention to levels. The package should explain the intended relationship between existing and new finished floors, not leave that relationship to a perspective rendering.

For openings and built-in features, confirm which dimensions are design dimensions and which need later site verification. If a selection is provisional, label it accordingly rather than presenting a representative product as the final specification.

5. Identify structural design and unresolved interfaces

Ask whether the structural information needed for the proposed pricing stage is available and coordinated with the architectural layout. Record who is responsible for any remaining design.

Useful questions include:

  • Does the proposed opening in the existing house match the structural information?
  • Are supports shown where the room layout expects them?
  • Do proposed structural depths affect ceilings, doors or service routes?
  • Are connections between the existing and new construction addressed?
  • Is any contractor-designed or supplier-designed component identified, with a clear scope?

These are coordination questions, not instructions for choosing beams, footings or connections. Have the appropriate design professional resolve the technical details. If something remains undetermined, ask how it is represented in the proposal rather than accepting an unexplained structural allowance.

6. Map services before finishes hide them

An addition drawing may show a comfortable room without explaining how its services reach it. Ask the relevant designers and trades to review heating, cooling, ventilation, plumbing and electrical needs as applicable.

For pricing, distinguish equipment from distribution and connections. A proposed fixture location does not by itself explain the route to it or the work required in the existing house.

Identify anticipated bulkheads, access panels, service relocations and affected finishes. Record any capacity assessments still outstanding. Do not treat a line on a concept drawing as confirmation that an existing system can serve the addition.

7. Detail the boundary between old and new

Use a separate review of the junctions where the addition meets the house. Ask how the package addresses roof and wall connections, water-management continuity, insulation and air-sealing transitions, and changes in exterior materials.

Inside, mark the extent of removal and reinstatement. Does flooring stop at a doorway or continue into an existing room? Which ceiling areas will be opened and repaired? Where does repainting end?

Also identify temporary work that needs pricing consideration, such as protection of exposed openings and separation from occupied rooms. The contractor can propose construction methods, but the package should make the intended scope and household constraints visible.

8. Attach selections and an open-item schedule

Drawings need a written companion for choices they cannot communicate clearly. List selected products by an identifiable reference and describe the intended finish where a final product is not yet chosen.

For each unresolved item, record:

  • The decision or missing information.
  • Who will resolve it.
  • The assumption contractors should use for pricing.
  • Whether it is included, excluded, an allowance or a separately priced option.
  • When it must be settled and which documents may change.

For example, an undecided exterior cladding selection should not disappear into a general note. Ask the team to define the pricing basis and identify which associated trim or installation details still need review.

9. Compare the responses, not just the totals

Ask contractors to return questions and qualifications against the same document register. Review these before treating the proposals as comparable.

If one contractor includes repairs to an adjoining room and another excludes them, resolve that difference explicitly. If a response reveals a missing design decision, update the package rather than answering each contractor differently.

The goal is not to suggest that drawings can reveal every concealed condition. It is to know what each price covers, what remains uncertain and who owns the next decision.

Bring your current drawings, document list and outstanding questions to Homes By Adam when discussing a Niagara home addition. A useful pricing conversation starts with a shared description of the work.